The contracting entity wants to have a complete 30 MW electric boiler plant built connected to their existing plant. The plant will be connected to the existing CHP plant in Elsinore, and built in a new adjacent building.
The system must be complete and include, among other things, high-voltage supply, piping to existing plants, heat exchanger, internal circulation pumps, electric kettle and complete control thereof.
The contracting entity wants to have a complete 30 MW electric boiler plant built connected to their existing plant. The plant will be connected to the existing CHP plant in Elsinore, and built in a new adjacent building.
The system must be complete and include, among other things, high-voltage supply, piping to existing plants, heat exchanger, internal circulation pumps, electric kettle and complete control thereof.