The Unstrut-Hainich-Kreis is planning to convert and renovate the Salza Hall in Bad Langensalza, which was built in 1994 and is currently used for school sports and for the competitive sport of the Thuringian Handball Club. Two main measures are planned. In the first, a new grandstand building is to expand the hall's capacities and a directly attached player wing is to be created. In the second measure, the necessary renovation and remodeling measures will extend to the roof and facade of the Salza hall, and secondly, the general expansion as well as the technical and sanitary facilities will also have to be repaired. The aim here is the sustainable construction of the building to ensure school sports operations and the modernization of the technical facilities to current standards.
BE + preparatory measures:
- BE,
- Prepare the subsurface approx. 1 300 sqm (+ repair parts and joints),
- Bitumen primer + floor sealing PE film approx. 1 300 sqm,
- Connection to rising parts (walls, ground sleeves, etc.),
- compensation fill approx. 900 sqm,
- Thermal insulation approx. 1 250 sqm.
Sports ground:
- sports floor construction approx. 1 300 sqm,
- impact sound layer approx. 1 300 sqm,
- Linoleum flooring approx. 1 300 sqm,
- initial care + sealing,
- wall connection strips approx. 150 m,
- field marking approx. 1 600 m,
- mobile sports surface approx. 1 300 sqm.
Underfloor heating (integrated in the sports flooring system):
- approx. 1 250 sqm,
- Connection to existing heating circuit manifolds 5 pieces,
- leak test,
- Heating circuit manifolds approx. 1 250 sqm.