Construction work for highways, roads | Tenderlake

Construction work for highways, roads

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 May 2021
Closing Date:
15 June 2021
Location(s):
PL72 Świętokrzyskie (PL Poland/POLSKA)
Description:
Construction of the section of National Road No. 74 connecting DK 9 and DK 74 — Northern connector

Construction of the section of National Road 74 connecting DK 9 and DK 74 — northern connector.

The designed section of National Road No. 74 connecting DK 9 and DK 74 so called Northern Connector, is located in Świętokrzyskie Voivodeship, Opatów County, in the territory of the city and the municipality of Opatów.

The task provides for the construction of a section of single carriageway road, GP class, guided by a new footprint, from the designed roundabout under the Opatow bypass on national road 9, to the existing DK74 in local km 3+098,34 and the existing picketing of approx. 144+700 km, inclusion of the roundabout type, outer diameter Dz=50m. The approximate, typical width of the road lane is about 50 m.

Within the scope of the task shall include:

— construction of a section of the GP class, dual carriageway road; DK 74

— reconstruction and construction of roads intersecting the built DK road,

— construction of engineering facilities (viaducts, culverts),

— construction of access roads to serve the adjacent site,

— the construction of environmental protection equipment (acoustic screens, water cleaner tanks, protective greenery, animal crossings, road fence),

— reconstruction and construction of technical infrastructure related and unrelated to the road, including the construction of technological channels.

Order value up to EUR 20,000,000.

Download full details as .pdf
The Buyer:
Generalna Dyrekcja Dróg Krajowych i Autostrad, prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Kielcach
CPV Code(s):
45233100 - Construction work for highways, roads
71320000 - Engineering design services