Architectural, interior design, lead consultant and principal designer services in relation to the Painted Hall. The works comprise:
— New inclusive entrance: partitions, ramps, steps, reception area, desk and associated display, lockers, decorations;
— Adaptations to King's entrance: washrooms, storage areas, conservation / decoration;
— Access ramp improvements (KW colonnade step);
— Draft lobbies/ draft doors to inclusive and King's entrances;
— Draft lobby in vestibule (if required);
— Draft proofing eastern cupola/ dome;
— Solar shading to Painted Hall windows;
— Joinery: Lower PH perimeter heating ducts, miscellaneous fittings;
— KW Undercroft cafeteria/ brasserie installation (non-HLF);
— KW kitchen works associated with Ampersand re-fit, e.g. flooring, drainage etc. (non-HLF);
— Furniture: PH benches (Provisionally 20no in Lower Hall, 4no in Undrcroft);
— Donors boards;
— KW secure retail design;
— Printed vestibule screen;
— Builders work in connection (BWIC) with all building services.
The construction budget is in the region of 4 000 000 GBP.