The subject of the contract is the task entitled Services related to the maintenance of watercourses in the area of Water Supervision Krakow – stage IV.
The Contracting Authority divided the order into the following parts:
Part 1 – Maintenance of the Serafa River in the area of the town Krakow at km 0+000-8+000
Part 2 – Maintenance of the Drwinka stream at km 0+000-1+700, 2+300-4+600 m. Kraków, Kraków commune
Part 3 – Maintenance of the Garliczka stream at km 0+000 - 5+020, Zielonki commune
Part 4 – Maintenance of the Kostrzecki stream at km 0+000-5+966, Dz. Podgórze, m. Cracow
Part 1 – Maintenance of the Serafa River in the area of the town Krakow at km 0+000-8+000The subject of the contract for Lot 1 is the maintenance of the Serafa River in the area of the city. Krakow at km 0+000-8+000.
The scope of the task includes:
- manual mowing of dense hard lichens from slopes – 48 000m2,
- raking mowed lichens from slopes over 2.0 m wide, self-development, in accordance with applicable regulations – 48 000m2
- manual cutting of medium-density bushes, self-management, in accordance with applicable regulations – 0.12 ha,
- works performed with backhoe excavators with a bucket capacity of 0.40m3 with transport of excavated material by self-unloading trucks over a distance of up to 5.0km - removal of obstacles, blockages, hindering the free flow of water, self-development, in accordance with applicable regulations - 776.0 m3,
- collection of obstacles, waste and garbage, hindering the free flow of water, pulled together with the spoil from the bottom of the watercourse with the transport of spoil by self-unloading trucks over a distance of up to 21.0 km, self-management, in accordance with applicable regulations - 65.0 m3,
- transverse earthworks for transfer with the incorporation of soil into the embankment – 185.0 m3,
- plantation of embankments and embankment crowns at water engineering works – 1200.0 m2,
- repair of bands made of fascine sausage with a diameter of 25cm – 900,0 m
- execution of ballast made of gravel or 10cm thick with land transport – 700.0 m2,
- repair of damaged insurance with openwork boards of the "KRATA" type small with dimensions of elements 90x60x10cm – 700.0 m2,
- renovation of 30cm thick natural stone pavement on slopes up to 4m – 100.0 m2 high,
- measuring works at linear earthworks - route of river streams with a bottom width of up to 7m - 0.1 km,
- excavations and earth excavations for deposition with displacement up to 100m – 10.0 m3,
- filling the gap on the right bank of the Serafa River with material obtained from the excavation and ditch and with delivery with compaction – 30.0 m3,
- digging the bottom and forming the left bank of the river on the section of 30m – 60.0 m3,
- dismantling and re-laying of existing JOMB gratings on the bank slope - assuming the need to replace 30% of the boards with new ones. Fastening to the slope with wooden piles – 220.0 m2,
- execution of reinforced concrete curb constituting the basis for embedding JOMB boards curb size 100cm * 40cm on the length of 50m - 20.0 m3,
- reinforcement of the bottom of the river bed from armour - stone diameter 400-800mm on the length of 57m - 257.0 m3
The detailed scope and type of works to be performed under the contract for Lot 1, the terms of implementation and obligations of the Contractor include: Description of the subject of the contract for Lot 1 constituting Annexes No. 1a to the SWZ and Model contract constituting Annex No. 11 to the SWZ
Part 2 – Maintenance of the Drwinka stream at km 0+000-1+700, 2+300-4+600 m. Kraków, Kraków communeThe subject of the contract for Part 2 is the maintenance of the Drwinka stream at km 0+000-1+700, 2+300-4+600 m. Kraków, commune of Kraków
The scope of the task includes:
- mechanical mowing of lichens from slopes with shredding of lichens (flail mower) – 37 400m2 – km 0+000 - 1+700,
- manual mowing of dense hard lichens from slopes – 13 530m2 – km 2+300 – 4+600
- raking mowed lichens from slopes over 2.0m wide, with export and self-management, in accordance with applicable regulations – 13 530m2 - km 2+300 – 4+600
- cleaning of frame culverts 2.0x2.0m from silt with a depth of silting of the cable up to 1/3 of the height - 32m,
- intervention works - earthworks carried out with backhoe excavators with transport up to 11km - removal of blockage in the form of earth overhangs and debris from the bottom, hindering the free flow of water in the stream bed - Arrangement of the area and development of excavated material on its own in accordance with applicable regulations – 250.0 m3 - km 2+300- 2+550
- planting, cleaning slopes and bottoms of mechanically made excavations – 228.0 m2 - km 2+350-2+410
- execution of gravel ballast with a thickness of 10cm – 228.0 m2 - km 2+350-2+410
- repair of damaged insurance with openwork boards type "KRATA" small with dimensions of elements 90x60x10cm – 228.0 m2 - km 2+350-2+410
- driving pins and retaining posts with a diameter of 4-6cm to a depth of 0.80m, anchoring openwork (two stakes per board) – 868 pcs. - km 2+350-2+410
- making a palisade driven to a depth of 1.50m from pegs with a diameter of 12-14cm – 15.2m - km 2+350-2+410
The detailed scope and type of works to be performed under the contract for Lot 2, the terms of implementation and obligations of the Contractor include: Description of the subject of the contract for Lot 2 constituting Annexes No. 1b to the SWZ and Model contract constituting Annex No. 11 to the SWZ
Part 3 – Maintenance of the Garliczka stream at km 0+000 - 5+020, Zielonki communeThe subject of the contract for Part 3 is the maintenance of the Garliczka stream at km 0+000 - 5+020, Zielonki commune
The scope of the task includes:
- manual mowing of dense hard lichens from slopes – 8000 m2,
- raking of mowed lichens from slopes along with export and self-management – 8000 m2,
- hacking when the surface of the water surface is overgrown over 60% - 100 m2,
- cleaning the area after hacking with removal and self-development – 100 m2,
- manual cutting of bushes and undergrowth of medium density - 0.15 ha,
- arranging the area from cut branches and branches and branches lying on the banks through removal and development on their own - 1500 m2,
- removal of windbreaks with cutting, export and self-development – 6 pcs,
- manual removal of dams and collection of garbage from the watercourse bed and accumulated old branches from slopes with export and self-management – 40 m3,
- manual clearing of the bottom of a watercourse up to 1.2 m wide and removal of overhangs from slopes, a layer of application up to 30 cm with removal of material from the clearing and self-management - 165 m,
- manual clearing of the bottom of the watercourse with a width of up to 1.2 m and removal of overhangs from slopes, layer of application up to 30 cm with spreading – 165 m,
- mechanical clearing of the bottom of the watercourse (nanos, rubble) with a width of up to 1.2 m and removal of overhangs from slopes, layer of application up to 30 cm with removal of the material from the clearing and self-management – 730 m (sections in various locations),
- clearing watercourses with a bottom width of up to 1.20 m with backhoe and desilting machines, thickness of the nanos layer 30cm – 390 m (sections in various locations),
- spreading of excavated material after mechanical unblocking of watercourses with a bottom width of up to 1.2 m from a nanos thickness of 30cm – 390 m (sections in various locations),
- cleaning culverts, bridges from nanos with a depth of silting up to 15 cm with export and self-management – 20 m,
- Felling of trees with a diameter of up to 30cm using the mountaineering method along with transport to the indicated place – 6 pcs,
- Felling of trees with a diameter of 31 to 60cm using the mountaineering method along with transport to the indicated place – 7 pcs,
- Felling of trees with a diameter of over 60cm by the mountaineering method along with transport to the indicated place – 9 pcs,
- felling trees with a diameter of up to 60cm with transport to the indicated place - 12 pcs,
- felling of tree stumps with a height of up to 5m to a diameter between 70-80cm with transport to the indicated place - 2 pcs,
- Reduction pruning by the mountaineering method of trees threatening life and property along with export and development on their own - 3 pcs,
- pruning branches located above 3 m above the ground by the county road along with export and self-development - 2 pcs,
- felling of willow suckers topped with a power saw with export and self-management – 10 pcs,
- repair of single bands made of fascine sausage with a diameter of 25cm – 200 m,
- execution of the covered edge in the spacing of sausage 0.6 m and width up to 3.0 m - 60 m2,
- Earthworks with the purchase of land, carried out by backhoe excavators with transport by dump trucks and wheelbarrowing – 10 m3,
- repair of double bands made of fascine sausage with a diameter of 20+20cm -70 m,
- Repair of existing fortifications made of openwork slabs – 6 m2,
- Tidying up the area after the completion of the work.
The detailed scope and type of works to be performed under the contract for Lot 3, the terms of implementation and obligations of the Contractor include: Description of the subject of the contract for Lot 3 constituting Annexes No. 1c to the SWZ and Model contract constituting Annex No. 11 to the SWZ
Part 4 – Maintenance of the Kostrzecki stream at km 0+000-5+966, Dz. Podgórze, m. CracowThe subject of the contract for Part 4 is the maintenance of the Kostrzeckiego stream at km 0+000-5+966, Dz. Podgórze, m. Cracow
The scope of the task includes:
- mowing grass lichens from slopes and the bottom of the stream along the entire length at km 0+000-5+966 and self-collection of hay, damming and cut bushes from sections located along public roads - especially from the section along Dąbrowa Street,
- removal of dams from the watercourse bed at km 0+000-5+966,
- bottom hacking on the section along Dąbrowa Street at km 2+100-3+480,
- sectional removal of silt from the bottom of the watercourse 2+100-3+480,
- removal of excavated dams, mowed lichens and cut bushes from the section running along public roads, especially along Dąbrowa Street, outside the area of works with self-development km 2+100-3+480.
The detailed scope and type of works to be performed under the contract for Lot 4, the terms of implementation and obligations of the Contractor include: Description of the subject of the contract for Lot 4 constituting Annexes No. 1d to the SWZ and Model contract constituting Annex No. 11 to the SWZ