National road 36 Skyggestein — Skjelbredstrand is a part of the Town Package Grenland phase 1. The project is fully financed by the government.
The project's extent:
— 3.5 km new 3 lane H5 road, through forest (which has been cut down) and cultural landscape.
— 1.6 km improvements to an existing road as well as the construction of a new foot and cycle path from Geiteryggen and further along county road 353.
— 8 concrete constructions. Three bridges (240 m, 126 m and 80 m), two environment tunnels (90 m and 30 m), 1 foot/cycle path culvert and 2 stream culverts.
— 2 roundabouts shall be constructed, 2 T-junctions and 1 X-junction.
— As well as minor alterations and alterations to the existing road network.