The subject of the contract includes the construction of a new section of the county road and a bridge over the San River with a length of 301.60 m, along with the construction of river bank fortifications. In order to organize the utilities infrastructure, reconstruction and protection of teletechnical and power networks is planned. In addition, the construction of a technological channel, the construction of street lighting and the construction of a tight road drainage were designed. The subject of the contract will be carried out on the basis of a ZRID decision having the rigor of immediate enforceability.
The material scope of the contract includes, in particular, the execution of the following construction works:
1) Removal of trees and shrubs interfering with the investment;
2) Reconstruction and securing to the necessary extent external equipment interfering with the investment;
3) Linking to intersections with the provincial road No. 835 and with the district road No. 2040R;
4) Renovation of the surface of the district road No. 2040R in the area of the intersection;
5) Construction and reconstruction of drainage ditches for the road body;
6) Construction of sidewalks within the designed intersections;
7) Construction of a multi-span road bridge with access roads with a total length of the object: 301.60 m;
8) Construction of the bridge structure drainage system;
9) Construction of street lighting and technological channel along the length of the designed road section;
10) Implementation of vertical and horizontal markings and road safety devices in adaptation to the designed geometry of the road in question.
A detailed description of the item of the order includes SWZ.