rku.it GmbH is planning to expand the SAP Hana environment with two additional IBM P9-E950 servers from the 9040-MR9 model (including maintenance & commissioning). Both systems will be integrated into existing racks:
description
Two IBM P9 E950 model 9040-MR9 with 40-core and 8TB RAM, each with the following details:
- 40-core (4 x 10-core/ #EPWS) typical 3.4 to 3.8 GHz
- 20x 1-core Linux processor activation for #EPWS
- 20x 1-core processor activation for #EPWS
- 8,192 GB RAM
- Active memory mirroring
- Power active memory expansion
- 4 x 800 GB SSD NVMe
- 11 out of 11 PCIe slots used:
o 5x EN15 PCIe3 4-port 10GbE SR adaptor
o 6 x EN1A PCIe3 32 GB 2-port fibre channel adaptor
- 20-core AIX V7 standard edition
- 20-core Power VM Enterprise Edition
- 1-2 socket SUSE SLES for SAP applications for power
- 20-core IBM PowerVM Linux Edition V3
maintenance
The offer must include 48 months of IBM maintenance (7x24h+ Enhanced Technical Support (ETS)) for hardware and software including IBM Proactive Support Services (PSS), and the performance must be delivered by an IBM Technical Advisor (TA).
Service/commissioning
The following service is required for the assembly:
1. Physical construction 2x P9 E950
-check for completeness of the delivery
- Unpack the hardware
- Assembly of hardware (if necessary)
- Assembly, insertion into the racks
- Cabling (power, LAN, SAN) to cables provided by the customer with labeling
- Initial commissioning with hardware function test
- Firmware update
2. Basic setup 2x P9 E950 for PowerVM
- Configuration of systems
- Setting up the power systems
- Connection of new systems to existing HMC
- Check/upgrade the firmware
- LAN connection
- SAN connectivity
- Installation VIOS (basic configuration without additional LPARs)
- LPAR setup
- Install VIOS (local or SAN)
- Upgrade to current patch levels
- Handing over the operation of the installed systems
- Basic setup LPARs (6 LPAR)
3. Installation & configuration SLES15SP1 for SAP applications (6LPAR)
- Integration of installation images into PowerVM
- basic installation
- Registration, update up to date and optional connection to the RMT system
- Configuration of the OS according to current SAP specifications and best practices
- Hardening of the OS according to client requirements
- Install and configure the HWCCT, run and analyze tests for environmental parameters
and storage performance
4. Documentation
- Preparation of installation documentation and handover to the client
rku.it GmbH is planning to expand the SAP Hana environment with two additional IBM P9-E950 servers from the 9040-MR9 model (including maintenance & commissioning). Both systems will be integrated into existing racks:
description
Two IBM P9 E950 model 9040-MR9 with 40-core and 8TB RAM, each with the following details:
- 40-core (4 x 10-core/ #EPWS) typical 3.4 to 3.8 GHz
- 20x 1-core Linux processor activation for #EPWS
- 20x 1-core processor activation for #EPWS
- 8,192 GB RAM
- Active memory mirroring
- Power active memory expansion
- 4 x 800 GB SSD NVMe
- 11 out of 11 PCIe slots used:
o 5x EN15 PCIe3 4-port 10GbE SR adaptor
o 6 x EN1A PCIe3 32 GB 2-port fibre channel adaptor
- 20-core AIX V7 standard edition
- 20-core Power VM Enterprise Edition
- 1-2 socket SUSE SLES for SAP applications for power
- 20-core IBM PowerVM Linux Edition V3
maintenance
The offer must include 48 months of IBM maintenance (7x24h+ Enhanced Technical Support (ETS)) for hardware and software including IBM Proactive Support Services (PSS), and the performance must be delivered by an IBM Technical Advisor (TA).
Service/commissioning
The following service is required for the assembly:
1. Physical construction 2x P9 E950
-check for completeness of the delivery
- Unpack the hardware
- Assembly of hardware (if necessary)
- Assembly, insertion into the racks
- Cabling (power, LAN, SAN) to cables provided by the customer with labeling
- Initial commissioning with hardware function test
- Firmware update
2. Basic setup 2x P9 E950 for PowerVM
- Configuration of systems
- Setting up the power systems
- Connection of new systems to existing HMC
- Check/upgrade the firmware
- LAN connection
- SAN connectivity
- Installation VIOS (basic configuration without additional LPARs)
- LPAR setup
- Install VIOS (local or SAN)
- Upgrade to current patch levels
- Handing over the operation of the installed systems
- Basic setup LPARs (6 LPAR)
3. Installation & configuration SLES15SP1 for SAP applications (6LPAR)
- Integration of installation images into PowerVM
- basic installation
- Registration, update up to date and optional connection to the RMT system
- Configuration of the OS according to current SAP specifications and best practices
- Hardening of the OS according to client requirements
- Install and configure the HWCCT, run and analyze tests for environmental parameters
and storage performance
4. Documentation
- Preparation of installation documentation and handover to the client