Roads Maintenance Framework 2024-2028 | Tenderlake

Roads Maintenance Framework 2024-2028

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 April 2024
Closing Date:
05 June 2024
Location(s):
UKM72 Clackmannanshire and Fife (UK UNITED KINGDOM)
UKM76 Falkirk (UK UNITED KINGDOM)
UKM77 Perth & Kinross and Stirling (UK UNITED KINGDOM)
Description:
Stirling, Clackmannanshire, and Falkirk Councils are seeking a framework agreement for various road maintenance works including street lighting installation, road resurfacing, road improvements, surface dressing, and pothole patching.
Roads Maintenance Framework 2024-2028.
Stirling Council, Clackmannanshire Council and Falkirk Council are carrying out an open tender procedure to create a framework agreement for works across their Road Services teams. The framework will cover works to supplement existing resources or where the Councils do not have the requisite expertise to carry the work out in house.
Lot 5 street Lighting
Installation of lighting columns (including bracket arm and lanterns);
Civils, ground works, surfacing reinstatements;
Tracking, Ducting and Cabling;
Electrical work and testing(low value);
Retrofitting LED Lanterns to existing columns;
Wall brackets.
Lot 6 Painting
Lighting Column painting (inclusive of cherry picker);
Street Furniture; Signposts.
Lot 7 Application of Cold In Situ Recycling
Regen process - Application of cold in situ recycling followed by the application of surface dressing to seal the surface.
Lot 8 Retread and Micro Asphalt
Retread process - a recycling process in which the existing aggregate in the road is used, bitumen emulsion is added and the road reshaped. It is usually suitable for use on lightly trafficked roads.
To prolong the life of the asset, this is usually followed by the micro asphalt process, however, each can be used independently.
The micro asphalt process is a two-phase process. First, a regulating layer of material is applied. This improves the surface profile of the road. This is followed by a second layer which gives the final surface. Both layers are usually applied on the same day, to a thickness of approximately 14mm
Lot 9 Infrared Pothole Patching
Infrared patching - uses an infrared heating unit to heat in-place asphalt to soften it to a workable state, then new asphalt can be added which fuses seamlessly to the old.
Lot 10 Spray Injection Patching
A process that allows road defects such as potholes, cracking and crazing to be fixed by applying a blended bitumen emulsion and aggregate mix to potholes for a permanent repair solution.
Lot 1 Roads Maintenance
Resurfacing / Reconstruction of Bituminous Carriageways and footways;
Kerbing; Carraigeway and Footway Patching;
Slabbing / Modular Paving / Natural Stone;
Footpath Construction;
Road Planing.
Lot 2 Roads Improvements
Minor Road Re-alignments;
Junction Improvements;
Traffic Calming Schemes;
Rural / Remote footpath and cycleway construction;
Dropped Footway Crossings;
Active travel schemes eg Cycleways;
Public Realm Projects using high quality materials; and
Any other roads related Civil Engineering project
Lot 3 Surface Dressing
Surface Dressing of Carriageways at Pre Determined Locations
Lot 4 vehicle Restraint Systems
Supply and Installation of Vehicle Restraint Systems and Terminals;
Repair of Damaged VRS';
Reinstatement of Surfaces.
Download full details as .pdf
The Buyer:
Stirling Council
Additional information:
Link:
Download Full Notice as PDF
Link:
View Notice Source
CPV Code(s):
34928110 - Road barriers
34993000 - Road lights
45233100 - Construction work for highways, roads
45233140 - Roadworks
45233141 - Road-maintenance works
45233142 - Road-repair works
45233200 - Various surface works
45233280 - Erection of road-barriers
45316110 - Installation of road lighting equipment
45442120 - Painting and protective-coating work of structures
50230000 - Repair, maintenance and associated services related to roads and other equipment