At the Mühlhausen CHP plant, fluidized bed furnace 2 is being renovated. The present award unit comprises the necessary construction power supply with the following main masses:
- Medium-voltage switchgear (3 MV fields), 2 MV transformers (2 x 1,000 kVA)
- Low-voltage distributions, total. approx. 11 pcs. control panels
- 9 pcs construction site power group distributor 277 kVA
- 1 x connection converter cabinet 173 kVA
- 2 St. Baustrom-Großgeräteverteiler 250 A/400 A
- 24 pcs construction site power distributor 44 kVA
- 2 x prefabricated concrete compact stations for 10 kV MV transformer systems
- Signal shunting for automation equipment
- Cable laying and general installations:
- Approx. 1,500 m N2XSY 6/10 kV cable (1 x 70 mm2 to 1 x 185 mm2)
- Approx. 4,400 m NSSÖU-J cable (5 x 1.5 to 5G120)
- Approx. 200 m fiber optic cabling
- approx. 800 m cable trays, hot-dip galvanized
- Lightning protection, earthing systems and equipotential bonding
- etc.
At the Mühlhausen CHP plant, fluidized bed furnace 2 is being renovated. The present award unit comprises the necessary construction power supply with the following main masses:
- Medium-voltage switchgear (3 MV fields), 2 MV transformers (2 x 1,000 kVA)
- Low-voltage distributions, total. approx. 11 pcs. control panels
- 9 pcs construction site power group distributor 277 kVA
- 1 x connection converter cabinet 173 kVA
- 2 St. Baustrom-Großgeräteverteiler 250 A/400 A
- 24 pcs construction site power distributor 44 kVA
- 2 x prefabricated concrete compact stations for 10 kV MV transformer systems
- Signal shunting for automation equipment
- Cable laying and general installations:
- Approx. 1,500 m N2XSY 6/10 kV cable (1 x 70 mm2 to 1 x 185 mm2)
- Approx. 4,400 m NSSÖU-J cable (5 x 1.5 to 5G120)
- Approx. 200 m fiber optic cabling
- approx. 800 m cable trays, hot-dip galvanized
- Lightning protection, earthing systems and equipotential bonding
- etc.