The contract involves the awarding of separate lots of:
- lot A: electricity supply,
- lot B: natural gas supply.
Lot A: electricity supplyElectricity supply. A share equal to at least 50% of the electricity needed to meet the contracting authority's needs must be provided with a production guarantee, which occurred in the absence of carbon dioxide emissions into the atmosphere, as required by art. 5 of the contract scheme.
Lot B: natural gas supplyNatural gas supply.