In the case of the construction project at the school building of the comprehensive school (46) Friedrich-Wilhelm-von-Steuben in Potsdam, the fire protection renovation and a far-reaching energy-efficient renovation are planned in several construction phases.
The work is carried out under the special conditions during ongoing school operations.
The services advertised here include metal construction work.
The school building has two floors and a partial basement (limited for the house connections).
After the contract has been awarded, the service is to be provided in 5 construction phases:
- Dismantling work in the area of the floors for door installation and for mullion and transom façades
- 11 pieces of exterior doors single-leaf, aluminium, glass filling
- 2 pieces of exterior door with fixed side panel, single-leaf, aluminium, glass filling
- 8 interior doors single-leaf, aluminium, glass filling, smoke protection
- 8 interior doors double-leafed, aluminium, glass filling, smoke protection T90
- 4 interior doors double-leafed, aluminium, glass filling, smoke protection
- Post-and-beam façade, aluminium for auditorium, multi-part elements with doors, windows and fixed glazing
- Windscreen system aluminium/glass multi-part, main entrance
- Türantriebstechnik/Feststellanlagen/Oberlichtantriebe
- Approx. 400 aluminium exterior window sills
- Approx. 7m inner railing steel in the foyer
No