a) The subject of the contract is a service consisting in the development of design documentation for reconstruction
pedestrian crossings consisting, m.in. in the construction of lighting to improve the safety of participants
traffic in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts
b) The Ordering Party described the subject of the contract with the following attachments:
- PPU - appendix no. 2
- Material scope including appendix - appendix no. 7
- Price tables for locations. pedestrian crossings - appendix no. 8
- Guidelines for lighting - appendix no. 16
c) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Min. 24 months
-Max. 36 months
counting from the day following the date of signing the final delivery and acceptance report
d) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract).
Part Ia) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part I concerns the construction of lighting,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Częśc IIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part II concerns the construction of lighting,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Częśc IIIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part III concerns the construction of lighting along with the reconstruction of infrastructure,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Częśc IVa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part IV concerns the construction of lighting including infrastructure reconstruction,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part Va) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part V concerns the construction of lighting including infrastructure reconstruction,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Part VIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part VI concerns the construction of lighting including infrastructure reconstruction,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Częśc VIIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part VII concerns the construction of lighting together with the reconstruction of infrastructure,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.
Częśc VIIIa) The subject of the contract is a service consisting in the development of design documentation for the reconstruction of pedestrian crossings consisting, m.in. construction of lighting to improve the safety of road users in selected locations of the city of Krakow as part of the task: Program for the construction of traffic lights, lighting of pedestrian crossings and other road safety elements – divided into eight parts, whereby:
- Part VIII concerns the construction of lighting including infrastructure reconstruction,
b) The Ordering Party has described the subject of the contract with the following attachments:
- Draft provisions of the contract (common for each part of the contract) constituting Annex 2 to the SWZ,
- Material scope with attachments (common for each part of the contract), constituting Annex 7 to the SWZ.
- Price tables for the location of pedestrian crossings (separately for each part of the contract) constituting Annex 8 to the SWZ,
- Guidelines for lighting, elements of street lighting, lighting of pedestrian crossings and illumination constituting Annex 16 to the SWZ,
c) The selected Contractor is obliged to implement the subject of the contract in accordance with the requirements set out in
Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2022, item 1083). A detailed description of the requirements in this respect is included in the SWZ (for all eight parts of the contract),
d) Required quality guarantee period for the Subject of the contract (regarding Parts I-VIII):
- Minimum 24 months
- Maximum 36 months
counting from the day following the date of signing the final delivery and acceptance protocol,
e) The Contracting Authority does not require the Contractor or Subcontractor to employ persons performing activities related to the performance of the contract on the basis of an employment relationship,
f) Deadline for performance and acceptance of the subject of the contract: 7 months from the date of conclusion of the contract (applies to all eight parts of the contract),
g) Description of the part of the contract, if the Contracting Authority allows partial tenders:
- The order consists of eight parts,
- The contracting authority allows for the possibility of submitting partial tenders,
- Each Contractor may submit a bid for all parts,
h) Information on the Contractor's on-site inspection or verification of the documents necessary to perform the contract referred to in Article 131(2) of the PPL:
- before submitting the bid, the Contractor is obliged to carry out an on-site inspection (applies to all eight parts of the contract),
- failure to carry out a site inspection by the Contractor will result in the rejection of its bid in accordance with Article 226(1)(18) of the PPL.