the consultation concerns the demolition of a building on plot A102 in Saint Alexandre, in the Gard department:
This work includes:
asbestos removal from buildings
Neutralization of dry and wet networks.
The preliminary deconstruction of finishing elements with selective sorting in accordance with Decree No. 2021-950 of 16 July 2021 on waste sorting;
Demolition of buildings by mechanical processes;
Conservation and consolidation of preserved elements;
Purging of foundations and demolition of underground networks;
The restitution of the platform;
waste disposal
building remediation work (Asbestos and Lead)removal of asbestos materials - fibro-cement sheets (including "Under tiles" plates);
Removal of asbestos materials - fibro cement ducts
removal of asbestos materials - glazing sealant joints;
Removal of asbestos materials - cement fibre cap
Initial air analyses
Operator air analysis
Environmental Air Analysis
Restitution air analysis
suspended solids analysis (Mest)
Disposal of asbestos-bearing waste
Removal of lead-bearing materials - earthenware
Removal of lead-bearing materials - baseboards
Removal of lead-bearing materials - wood joinery contaminated with lead paint
Removal of lead-bearing materials - metal joinery contaminated with lead paint
Removal of lead-bearing materials - plasters with wallpaper
Operator air analysis
Restitution wipe test
suspended solids analysis (Mest)
Disposal of lead waste
Demolition worksSite installations
Network interventions
Administrative documents
Disposal of hydrocarbon residual products
Waste disposal
removal of a septic tank
removal and disposal of furniture and equipment
Removal and disposal of pipes and insulation
Removal and disposal of electrical equipment and wiring
Removal and evacuation of sanitary appliances
removal and removal of heating appliances
Removal and evacuation of floors and false ceilings
Removal and evacuation of joinery
removal and evacuation of blankets
removal and removal of structures
Total demolition of buildings and removal of demolition materials
Establishment of arase on partially preserved wall
Implementation of a final closure