The subject of the award is the electrotechnical equipment of the new Aicha and Thundorf pumping stations and the Siel Poschenlohgraben to ensure flood protection. In addition, installation work must be carried out in the old scaffolding plants in Thundorf and Aicha.
Aicha pumping station
Fully comprehensive planning, documentation, manufacture, delivery, installation, commissioning essentially from:
- 1 medium voltage switchgear;
- 2 transformers;
- Power distribution (local network and transformer network);
- 2 pump controls with (4 cabinets);
- 1 level and slide cabinet;
- 1 remote data transmission cabinet with UPS;
- level measurements;
- fish scaring system;
- electrical installation inside and outside the building;
- Electrification Siel Poschenlohgraben with control cabinet;
- cabling work;
- Installation of a gateway of the VNB (Bayernwerk);
- Equipment.
Thundorf pumping station
Fully comprehensive planning, documentation, manufacture, delivery, installation, commissioning essentially from:
- 1 medium voltage switchgear;
- 2 transformers;
- Power distribution (local network and transformer network);
- 4 pump controls with (8 cabinets);
- 1 level and slide cabinet;
- 1 remote data transmission cabinet with UPS;
- level measurements;
- fish scaring system;
- electrical installation inside and outside the building;
- cabling work;
- Installation of a gateway of the VNB (Bayernwerk);
- Equipment.