The project consists of: Restructuring of the half-board and the teaching kitchen with a capacity of 350 meals per day (production) Extension and partial restructuring of boarding schools The redevelopment of the GPPE sector The rehabilitation of changing rooms, toilets and showers in 2 workshops Accessibility of the high school - form of market: ordinary. Award of a contract for each lot
asbestos removal Demolition Structural workasbestos removal - demolition - structural work
Plumbing heating ventilationPlumbing - Heating - Ventilation
Outdoor FacilitiesOutdoor Facilities
Kitchen EquipmentsKitchen Equipments
Freight ElevatorsElevators - Freight elevator
PMR liftPMR lift
Wood frameWood frame
Waterproofing covercover - waterproofing
Facade treatmentFacade treatment
Exterior joinery aluminium metalworkexterior joinery Aluminium - metalwork
Interior joinery Plastering Suspended ceilingsInterior joinery - Plastering - Suspended ceilings
Earthenware FlooringFlooring - Faience
PaintingPainting
High Current Low Electricityelectricity high current - low current