Attractiveness of the Rastede outdoor swimming pool, sanitary work
Drainage inside the building is carried out using 140 m of dirty water pipe, 30 m
Grease sewer pipe, 80 m rainwater pipe, 81 floor drains and a pump sump. For the
Drinking water system, 655 m of stainless steel pipe and 350 m of PE pipe are laid for burial. For
The hot water is provided by 2 fresh water stations and a stratified charging tank.
A total of 20 shower panels, 14 toilets, 3 urinals, 10 washbasins and a toilet with
Shower provided.