The construction site is located in a residential area between a sports field and a primary school. The new building of the "Ländcheshalle" is divided into a 3-field sports hall and a multifunctional hall with a connecting foyer on 2 floors.The construction site area is located on the short side of the adjoining halls.
The two halls are reached by a 180 meter long access road, which is to be created on the border to a lower sports field. The demarcation of the path with precast concrete angles for coping with the height difference is part of the tender, in addition to the earth movements for the raw creation of the way without Oberbelagsarbeiten.
The halls consist of a load-bearing reinforced concrete construction, the roof structure of steel profiles and trapezoidal sheets in the hall areas with visible underside and in the functional areas made of reinforced concrete.
Facade openings are designed as steel glass facade elements or doors.
The type of construction describes a construction work.
Execute earthworks and the setting of angle concrete columns with appropriate frost-free foundation to delineate the development path to be created to the lower neighborly plot. There is also a fence along the way to the execution.
- deliver and install approx. 180 m L-reinforced concrete walls, height from 0.5 m to 3.0 m,
- About 700 m
- Earthworks for way and L-reinforced concrete walls about 700 m
- Stabgitterzaun length about 180 m.
Execution in mid-January 2019