Revitalization of railway line No. 171 at the Sosnowiec Dańdówka station along with the reconstruction of railway traffic control devices at the Kozioł branch post and the reconstruction of the control room at the Dąbrowa Górnicza Wschodnia station as part of the investment project entitled: "Works on the south-eastern GOP beltway with adjacent sections".
The subject of the Order includes the performance of the following elements:
1) Design documentation, including: a) development of construction projects, b) development of detailed designs, c) preparation of as-built documentation, including as-built geodetic documentation,
2) Implementation of works in the areas of:
2019 year:
Sosnowiec Dańdówka station
- developing multi-branch detailed design documentation,
- reconstruction of the railway pavement in track 1 from junction 3 to junction 48,
- reconstruction of the railway pavement in track 3 from junction 10 to junction 39,
- replacement of 11 ordinary turnouts with longitudinal and transverse drainage under the turnouts, strengthening of the trackbed load capacity and installation of a new crushed stone,
- commencement of a comprehensive reconstruction of the YC120-2CS150 traction network over tracks No. 1, 2 and the C-120-2C traction network over track No. 3 and over the crossing points,
- preparation of project documentation and obtaining a building permit,
- start of construction of control room and access road,
- start of construction of new railway traffic control devices,
- preparation of detailed design documentation.
Goat branch post
- preparation of project documentation and obtaining a building permit,
- commencement of building a new container along with accompanying works,
- commencement of reconstruction of railway traffic control devices with transfer of control to the control room with DTA at the Dabrowa Górnicza Towarowa station,
- preparation of detailed design documentation.
2020:
Sosnowiec Dańdówka station
- revitalization of the railway pavement in track 2 from junction 1 to junction 50,
- replacement of 6 ordinary turnouts,
- complete reconstruction of the overhead contact line,
- completion of control room construction,
- obtaining an occupancy permit,
- continuation of development of railway traffic control devices,
- installation of eor devices in 34 switches.
Goat branch post
- completion of the construction of a new container with associated works,
- completing the reconstruction of railway traffic control and telecommunication works.
Dąbrowa Górnicza Wschodnia station
- reconstruction of the control room.
2021:
Sosnowiec Dańdówka station
- completing the installation of railway traffic control devices.