L 73 BW 0003 Prosigker Brücke and DB AG in Köthen, VP 3 joint action
Basic road development of the L 73 and B 185 in the local passage through Köthen, including 7 junctions with subsequent road branches of the municipal roads,
with new installation of road-accompanying bicycle/sidewalks and section-by-section renewal of common footpaths/cycle paths along the road, drainage canal work,
Complex measures of several construction load carriers (including VU)
Overall length of the L 73 = approx. 569 m
Installation length of the B 185 = approx. 365 m
Construction length of municipal roads = approx. 250 m
Erection of 3 retaining walls to reduce the dam width on non-buildable areas in reinforced concrete construction
-Asphalt roadway and cycle paths in sections
-Control width 7.0 m with two lanes as well as additional turn-off lanes at junctions of the same plan
-Safety/separating strips, borrows and the like bonded paving construction (mainly natural stone)
-subordinate roads and paths partly paved concrete or partially paved concrete composite stone paving
-Unbound paved walkways in sections
-L 73 with 1.80 m wide sidewalks on both sides and 2.0 m wide furnishing cycle paths
-B 185 with 1.80 m wide footpath (in some areas) in the left and 2.50 m wide walking/cycle path in the right side room
-complete dam dismantling of old stock, soil reuse for new dam filling with soil improvement by mixing in coarse grain and hydraulic BM
-Tw. soil replacement, partially hydraulically bound base layer material as substructure (HGT and KRC) in sections
-Installation of geotextile under subgrade
-Civil engineering for utilities (TW, gas, electric
-Sewer construction (PP/reinforced concrete road drainage) with shafts and road drains as well as heavy-duty channels
-Sewer construction (PP/reinforced concrete wastewater) with house connections
-bypass duct, hose lining
-ordnance clearance