Roofing work as part of the expansion and conversion of the Ravensberger Gymnasium
approx. 1,000 m² demolition of roof structure Existing roof (flat roof), multi-layered, partly Polluted
approx. 290 running metres of gutters + downpipes
approx. 225 running metres of roof edge profiles
approx. 2,000 m² floor slab waterproofing
approx. 195 m² mastic asphalt
approx. 2,000 m² flat roof structure with slope insulation over 2nd or 3rd floor
approx. 315 running meters attic connection insulated
ca. 115 lfdm Bewegungsanschluss
ca. 240 lfdm Dachrandprofile
Sealing approx. 40 pillar feet
ca. 4 Dachverglasungen
approx. 345 m² flat roof structure with slope insulation above ground floor
approx. 490 m² Waterproofing Roofs Handling
ca. 280 Kantrinne lfdm
Roofing work as part of the expansion and conversion of the Ravensberger Gymnasium
approx. 1,000 m² demolition of roof structure Existing roof (flat roof), multi-layered, partly Polluted
approx. 290 running metres of gutters + downpipes
approx. 225 running metres of roof edge profiles
approx. 2,000 m² floor slab waterproofing
approx. 195 m² mastic asphalt
approx. 2,000 m² flat roof structure with slope insulation over 2nd or 3rd floor
approx. 315 running meters attic connection insulated
ca. 115 lfdm Bewegungsanschluss
ca. 240 lfdm Dachrandprofile
Sealing approx. 40 pillar feet
ca. 4 Dachverglasungen
approx. 345 m² flat roof structure with slope insulation above ground floor
approx. 490 m² Waterproofing Roofs Handling
ca. 280 Kantrinne lfdm