The subject of the contract is the construction, reconstruction and reconstruction of devices and small water retention facilities in the Zamrzenica Forest District according to the design documentation attached to the ToR.
The order was divided into 3 lots:
1) small retention in Lisiejama's forestry - task "Counteracting the outflow of water from the swamps" Karpaty "and" Mordowiec "- as part of the task, three water thresholds and one dam with a water threshold will be built to prevent uncontrolled outflow of water from forest swamps.
2) small retention in the city of Zamość - as part of the task, a water test and culvert will be built to increase the catchment of the existing wetland.
3) small retention in the village of Pieńkowo and protection of wetland meadows - as part of the task, 15 water thresholds / gates will be built, 4 footbridges and 2 road culverts to slow down the outflow of water from forest areas. As part of the task, agrotechnical works will be carried out on wetland meadows - the first mowing of the meadows is carried out
Task "Counteracting the outflow of water from the swamps" Karpaty "and" Mordowiec "- as part of the task, three water thresholds and one dam with a water threshold will be built to prevent uncontrolled outflow of water from forest swamps.
As part of the task, a water test and culvert will be built to increase the catchment of the existing wetland.
As part of the task, 15 water thresholds / sluices, 4 level crossing and 2 road culverts will be built in order to slow down the outflow of water from forest areas. As part of the task, agrotechnical works will be carried out on wetland meadows. As part of the task, agrotechnical works will also be carried out on wetland meadows - the subject of the contract is the first mowing of the meadows (see project of reclamation of the meadows - description of the planned works - first mowing - odd years).