The heat generation plant currently in operation supplies the secondary school located at Karl-Marx-Straße 108, including the sports hall there, as well as the residential buildings at Karl-Marx-Straße 109 - 113, which are grouped together in three blocks and are owned by the municipal Wildauer
Housing Association (WiWO), with heating water.
School and apartment blocks together required a nominal heat output of about 500 kW.
The Volkshaus opposite the school at Karl-Marx-Straße 36 is also connected to the heat generation plant at Karl-Marx-Straße 108 by means of a heating water district heating route and transfer station and requires a nominal heat output of approx. 120 kW.
In the future, further buildings of the housing association (WiWO) are to be connected with a nominal heat output of approx. 140 kW.
The new heat generation plant to be built and a CHP plant to be built are thus expected to provide a total of
Provide thermal power of 760 kW.
The bidder undertakes to completely renew the wind turbine, including the adaptation of the water heating and chimney system with IBN, from the start of the contract, at the latest by 31.08.2024. On the cost side, this renewal will be carried out entirely by the bidder.
In addition to the wind turbine, a combined heat and power plant (CHP) is to be installed by the bidder for self-generation, which is to be presented economically by means of a lifetime.
The Volkshaus, which is still to be supplied, must be taken into account in the renewal of the system technology and, if necessary, adapted and modified.
All components named so far are part of the overall system of this tender and are hereinafter referred to as the Appendix.
The newly constructed plant will remain the sole property for the entire term of the contract and will remain in the
complete operational management of the bidder.
The bidder shall hold all necessary permits for the operation of the plant and shall ensure compliance with all legally prescribed tests.
Furthermore, the bidder is responsible for the dismantling and disposal of the old plant and takes over all the necessary costs.
required services and costs.