New construction of a triple sports hall adjacent to the Dachau-Ost primary school
- Heizungsinstallationsarbeiten
Gas condensing boiler 120 kW, 1 pc.
Air-to-water heat pump 64 kW, 1 pc fresh water station, 1 pc
Schichtenspeicher, 2 St
Carbon steel system pipe (DN12-DN65), approx. 710 m underfloor heating, approx. 410 m2
Sportbodenheizung, ca. 1400 m2