51000 outdoor facilities in general — demolition pavement areas: asphalt approx. 135 m
— construction road dismantle: concrete fracture approx. 105 t,
— grubbing: hedges approx. 170 m
Stage I:
— earthworks: topsoil: approx. 260 m
— drainage: finishing trench construction approx. 1 300 m
— finishing material on site cones set 15 pcs., covers set 39 pcs (rigolen+inspection shafts),
SSK approx. 25 pcs., cables approx. 60 m cleanliness runs Sizes 5 pcs - angle support elements: approx 78 pcs; gabion wall: about 65 m,
— Coating work: concrete paster: approx. 33 m
Color asphalt approx. 3 400 m
With and without green roofing, waste containments,
— cook foundations 26 pcs.,
— railings: approx. 5.5 m; privacy screen approx. 8 m,
— Seeds: lawn: approx. 2 820 m
hedge: 251 pcs; ground cover: approx. 2,800 pcs.
construction phase II
— demolition pavement areas: asphalt approx. 20 m
— construction road dismantle: concrete fracture approx. 31 t,
— earthworks: topsoil: approx. 65 m
— covering work: concrete surface fasters: approx. 155 m
— Granite bezels: approx. 45 m,
— Seeds: lawn: approx. 10 m
See II.1.4).