Electrical installations: In the course of the general renovation of the primary, middle and open all-day school, the construction phases BA 1.3 and 1.4 are to be carried out. In BA 1.3 mainly work is to be carried out in existing buildings, in BA 1.4 it is the new construction of the extension building in wood/concrete hybrid construction.
1 main distributor,
8 St. Unterverteiler,
approx. 15,000 m of cable and wires,
7000 m EDP cabling,
400 luminaires,
emergency lighting with central battery system,
Fire alarm system with connection,
Durchsageanlage,
fire protection measures,
lightning protection systems.