Works for complete or part construction and civil engineering work | Tenderlake

Works for complete or part construction and civil engineering work

Contract Value:
-
Notice Type:
Contract award notice – utilities
Published Date:
24 December 2021
Closing Date:
Location(s):
IE IRELAND
Description:
Civil Balance of Plant (CBOP) Contract for Oweninny Phase 2 Wind Farm

Oweninny Power 2 DAC, the Contracting Entity , is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The Contracting Entity now intends to procure works, supplies and services related to civil balance of plant for the Oweninny Phase 2 wind farm project.

Oweninny Phase 2 wind farm is an 83MW project located adjacent to the existing 89MW Oweninny Phase 1 Project. The Contracting Entity plans to develop the phase 2 project commencing in 2020.

The Contracting Entity intends to procure works, supplies and services related to civil balance of plant for the Oweninny Phase 2 wind farm project.

The scope of work for Contract shall include the design, procurement and installation for the following non-exhaustive list, however tenders should note that the detailed scope and contracting strategy will be determined at tender stage:

1. Site Accommodation for the Employer & Engineer

2. Fulfilling the role of PSCS during all or part of the Works, which may include other parties on site (e.g. Wind Turbine Generator (WTG) Erection & Electrical Balance of Plant (EBOP) contracts

3. Pre-construction surveys

4. Enabling Works

5. Discharge of Planning Conditions

6. Onsite access tracks

7. Stream Crossings

8. Drainage Works

9. Site compounds grading and fencing for the WTG erection and EBOP contractors

10. Public road modifications to facilitate delivery of abnormal loads from the Port to Site

11. On site & offsite scrub clearance/tree felling

12. WTG Foundations & crane hardstandings

13. Civil works attendance on other contractors on site

14. Met mast procurement and erection, including foundation and crane hardstanding

15. Reinstatement

16. Route modifications along haul route to facilitate WTG transportation and subsequent reinstatement works

17. Environmental monitoring and reporting including dust noise and water quality during the construction phase

Some post construction works/services during the project operational phase may also be included in the scope of the Contract.

Awarded to:
Civil Balance of Plant (CBOP) Contract for Oweninny Phase 2 Wind Farm
Roadbridge Ltd, Limerick (IE)
Download full details as .pdf
The Buyer:
Oweninny Power 2 DAC
CPV Code(s):
45200000 - Works for complete or part construction and civil engineering work
71322000 - Engineering design services for the construction of civil engineering works