Electrical work 1.BA
• 5 St. Unterverteilung
• approx. 11700 m high/low current pipeline network
• approx. 800 m high/low current pipeline network for I&C technology
• Verlegesysteme
• approx. 330 switches/sockets/branches
•Fire protection
• Engine control units for expansion Sun protection centre
• approx. 146 luminaires
• approx. 41 escape sign luminaires and emergency lighting (single battery)
• Computer standing and wall cabinet
• Approx. 35 EDP junction boxes
• Approx. 1320 m data cable Cat7 Duplex
Special features regarding the execution deadlines:
BA 1 Library to central aisle 15.4.2024 to 15.11.2024;
BA 1 Aula 15.08.2024 to 28.02.2025