The assignment is a working and ready-to-use TES system, certified in accordance with BRL 11 000 and according to specifications and planning on the Campus of Wageningen University and Research.
Work includes, among other things: supplying and installing new cold and heat WKO loop pipes (2 times approx. 1.8 km, for cold and hot water, varying in diameter and associated spurs to buildings and sources, including the associated fittings (valves, blind flanges, etc.) .) Delivering, drilling, developing and connecting 6 new sources (3 source pairs) and adapting 12 existing sources (6 source pairs).
The assignment is a working and ready-to-use TES system, certified in accordance with BRL 11 000 and according to specifications and planning on the Campus of Wageningen University and Research.