The subject of this EU announcement is the wooden façade trade for phase II of the construction project Conversion & Renovation of the existing Therapy and Wellbeing Center in D-08648 Bad Brambach. The other trades will be published in separate announcements.
Dismantling/Coating/Mounting of wooden slats 1350 m
Dismantling/coating/assembly of trapezoidal plastering elements in the 40 m² Dremple area
Dismantling/disposal of facade panels from west and east gables 125 m²
Dismantling steel swords 21 pcs
Various façade additions including UK and insulation for new connecting bridge and new façade elements, a total of 27 m²
Facade supplement/ coating of multi-layer facade panels of west and east gable 125 m²
Coating of the existing south façade including soffit 550 m²
Coating the existing rafter heads 43 m²
Particularities:
Special measures for construction work in the healing spring reserve (medicinal water protection zones II) are
required. Vehicles, machines and equipment are to be operated on biofuel. hydraulic drives
, where technically possible, must be converted to bio-hydraulic oil.