Prefabricated buildings. Assembly and erection of prefabricated structures. Prefabricated constructions. Prefabricated units. Construction work for subsidised residential accommodation. Residential homes construction work. Hyde has undertaken a comprehensive review of our approach to housing development, putting in place a forward looking and robust development programme aligned to Hyde's 5 year Strategic plan. A critical part of its successful delivery is putting in place long term arrangements with a selected number of key partners, to further our ambitions in building innovative homes using Modern Method of Construction (MMC) systems. Hyde has a significant planned development programme, and it is anticipated that circa 1 500 units per annum could be delivered across the Group's main geographical areas of operation (mainly London, the South Coast, and Kent) — of which Hyde aspire to develop up to 10 % of our programme utilising an MMC system. There are 5 categories used by the Housing Corporation to classify an MMC construction system. Hyde are seeking bids from innovate providers with a demonstrable track record in delivering residential housing, using any of the MMC systems listed below, whilst also possessing the associated development management services:
1.Off-site manufactured — volumetric—Three-dimensional units produced in a factory, fully fitted out before being transported to site and stacked onto prepared foundations to form dwellings.
2.Off-site manufactured — panellised—flat panel units built in a factory and transported to site for assembly into a three-dimensional structure or to fit within an existing structure).
3.Off-site manufactured — hybrid—Volumetric units integrated with panellised systems.
4.Off-site manufactured — sub-assemblies and components—Larger components that can be incorporated into either conventionally built or MMC dwellings.
5.Non-off-site manufactured MMC—Innovative methods of construction used on-site and the use of conventional components in an innovative way.