Prefabricated buildings | Tenderlake

Prefabricated buildings

Contract Value:
GBP 100M - 100M
Notice Type:
Contract award notice
Published Date:
23 October 2015
Closing Date:
Location(s):
UKI LONDON (UK UNITED KINGDOM)
Description:

Prefabricated buildings. Assembly and erection of prefabricated structures. Prefabricated constructions. Prefabricated units. Construction work for subsidised residential accommodation. Residential homes construction work. Hyde has undertaken a comprehensive review of our approach to housing development, putting in place a forward looking and robust development programme aligned to Hyde's 5 year Strategic plan. A critical part of its successful delivery is putting in place long term arrangements with a selected number of key partners, to further our ambitions in building innovative homes using Modern Method of Construction (MMC) systems. Hyde has a significant planned development programme, and it is anticipated that circa 1 500 units per annum could be delivered across the Group's main geographical areas of operation (mainly London, the South Coast, and Kent) — of which Hyde aspire to develop up to 10 % of our programme utilising an MMC system. There are 5 categories used by the Housing Corporation to classify an MMC construction system. Hyde are seeking bids from innovate providers with a demonstrable track record in delivering residential housing, using any of the MMC systems listed below, whilst also possessing the associated development management services:

1.Off-site manufactured — volumetric—Three-dimensional units produced in a factory, fully fitted out before being transported to site and stacked onto prepared foundations to form dwellings.

2.Off-site manufactured — panellised—flat panel units built in a factory and transported to site for assembly into a three-dimensional structure or to fit within an existing structure).

3.Off-site manufactured — hybrid—Volumetric units integrated with panellised systems.

4.Off-site manufactured — sub-assemblies and components—Larger components that can be incorporated into either conventionally built or MMC dwellings.

5.Non-off-site manufactured MMC—Innovative methods of construction used on-site and the use of conventional components in an innovative way.

Awarded to:
F1 Modular Ltd, Newtown (UK)
Laing O'Rourke Construction Ltd, Dartford (UK)
Mar City Plc, Birmingham (UK)
Mears Limited, Gloucester (UK)
Download full details as .pdf
The Buyer:
The Hyde Group
CPV Code(s):
44211000 - Prefabricated buildings
45215210 - Construction work for subsidised residential accommodation
45215214 - Residential homes construction work
45223800 - Assembly and erection of prefabricated structures
45223810 - Prefabricated constructions
45223821 - Prefabricated units