The reason for this is the resolution of the municipal council to accommodate around 25 crèche children in the existing building, which was used as a single home until a few years ago. The building must be prepared or converted accordingly. In addition to the application for conversion required for this, the outdoor facilities are also complete for future use. to prepare. The building and the property are owned by the Neuenkirchen municipality and have their own driveway.
The existing one-storey building (approx. 330 m2 GFA) was built towards the end of the 1980s as a dormitory for single people in a conventional construction. Due to the way it was built, the building was divided in the middle by a fire wall. A total of six small apartments were available. In the immediate vicinity of the building is the community-owned kindergarten and the community's voluntary fire brigade. District heating is available in the building.
There are only copies of the building's floor plan and the foundation plan with the entry of the SW lines planned at the time.
The subject matter of the order are general planning services consisting of the service profiles object planning buildings and interiors, object planning outdoor facilities, specialist planning structural planning, specialist planning technical equipment (system groups 1, 2 and 3, specialist section water, heating, ventilation as well as system groups 4 and 5, specialist section low-voltage, high-voltage current and system group 7, consulting services , Special services.
It is hereby expressly pointed out that an order from LpH 4 can be expected, subject to the funding commitments or after submission of the funding commitment and the confirmed space program as well as the Z-building examination. If the commitments are made, the commissioning takes place in stages.
There is no general legal right to further commissioning! For further details see II.2.4 of this announcement.
In accordance with VgV 2016, planning is awarded via an open procedure. The applicant who can expect the best possible solution of the task based on his offer receives the order. The general planning services advertised for the construction project mentioned in section II.1.1) include basic services described in detail, special services and consulting services by the general planner (see Annex 1-5 in the tender documents).
The subject matter is general planning services consisting of the following service profiles: Object planning buildings and interiors (LPH 1-9, object planning outdoor facilities (LPH 1-9), specialist planning structural engineering (LPH 1-6),
Technical equipment planning (LPH 1-9) (system groups 1, 2 and 3, specialist section water, heat, ventilation and system groups 4 and 5, specialist section low-voltage, high-voltage current and system group 7)
Consulting services, special services.
The commissioned planner must first provide LPH 1-3.
Optional services:
- LPH 4-9 object planning buildings and interiors,
- LPH 4-9 project planning open-air facilities,
- LPH 4-6 specialist planning structural planning,
- LPH 4-9 Technical equipment planning (plant groups 1, 2 and 3, water, heat, ventilation.
As well as system groups 4 and 5, specialist section low-voltage, high-voltage current and system group 7) - Special services in all service phases of the aforementioned service profiles,
- Consulting services in all service phases of the aforementioned service profiles
It is expressly pointed out that further allocation from LPH 4 is planned and is reserved. There is no legal claim to further commissioning. This applies to all services
Including special and advisory services (see II.2.11).
All tender documents are available to interested companies to download free of charge from the tendering platform in accordance with Section 41 VgV (see section 1.3.).
An additional coordination or training effort as well as a general planner surcharge is not granted by the client and not agreed. The order is to be viewed as an overall measure in terms of costs. In the event of subsequent joint commissioning of property planning services and specialist planning services, technical equipment, Section 33 (2) HOAI does not apply, so that no increased chargeable costs are taken into account when determining the fee and remuneration.