The subject of the contract are the supply of necessary equipment for fire detection, including the installation of an antenna on a mast at the headquarters of the Forest District Koło and equipment for the Alarm and Dispatch Point ("PAD") along with the necessary construction works consisting in the reconstruction / modernization of 4 existing fire observation rooms, aimed at the implementation and use of a maintenance-free monitoring and warning system for noticing fires. The order will be implemented as part of the financing of the project "Comprehensive project of adaptation of forests and forestry to climate change – prevention, counteracting and reducing the effects of threats related to forest fires". The execution of works along with the delivery of the necessary equipment will enable the transmission of a signal from the fire towers. located in the area of the Koło Forest District and the Konin Forest District to PAD located at the headquarters of the Koło Forest District, with the use of spotting located in the Koło Forest District and the mast at the headquarters of the Koło Forest District.
Delivery of fire detection equipment, including the installation of the antenna on a mast at the headquarters of Nadl. Wheel and equip. Alarm.Dispatch Point. (PAD) together with the necessary construction works consisting in the reconstruction of 4 fire protection notices, aimed at the implementation and use of maintenance. fire detection monitoring and sharpening system. The system will allow you to send a signal from fire towers. Locate. in Nadl. Koło i Nadl. Konin to PAD at the headquarters of Nadl. Wheel, using the perceptible zlokal. in the area of Nadl.Koło and the mast at the headquarters of Nadl. Wheel. Orders include: Nadl. Circle:a)Tower obs. Kościelec:-dismantling of the observation cabin.with utilization., prefabrication of galvanized steel., assembly of the shaft of the constr. o "Repetitive" segment 2 m with the place of installation of the fire protection camera and radio line, wyk. Fundam weighting. Noticeable, dismantling the fence, making a new fence, installing a new fence in place of dismantling or between the curb. constr., assembly "under" a new mast telekomunik.na the area of Nadl. Circle-terrain sharpen. Kościelec cabinets telekomunikac.typu OUTDOOR, assembly "under" the new telecommunications mast. in Nadl. Koło – access area Kościelec indispensable.electronics required by solutions detail. in the OUTDOOR cabinet, installation of a fire protection camera and necessary electronics, installation of radio line antenna, installation of the SSWiN system, assembly of SKD, assembly of accumulator batteries. 48V DC,other, not replaced. Robots necessary. to perform. Dock. design Attachment No. 2.1to SWZ b) Observation Tower. Page: scope of works and supplies as in point a) Doc.projektowa Appendix. No. 2.2 to SWZ c) Electrical connection to the fire tower Side (Dz.nr 5187;ok.795 m) on the section from the cable and measurement connector to the location of the tower. Dock. Project. Incl. No 2.3. to SWZ d) Power engineering connection. to the fire tower. Kościelec (Dz.nr 5431/2;ok.666 m) on the section from the cable and measurement connector to the location of the tower. Dock. design Attachment nr 2.4.do SWZ e)Construction of a mast at nadl. H stem=42 npt. with power connection. with the necessary mast installation and antenna installation and demolition of the ISDN. mast H of the shaft = 21 npt: - execution of foundations, delivery and assembly of the mast structure with a height of 42m (total height 43.95m), installation of earthing and lightning protection., execution of electrical installation for the purpose of powering the mast, demolition of the existing mast, other, not mentioned works necessary to perform the subject of the contract. Dock. design is Annex. No. 2.5doSWZ Ordering Delivery and assembly of any mast with constr. steel about param. Tech. as above.f) (PAD) at the headquarters of Nadl. Wheel- Equip.:Monitors for operating cameras - 5 pcs; Computer in a RACK cabinet for software operation. for smoke detection - 1 set; Manual camera control panel - 1 pc; RACK cabinets - 2 pcs. Dock. delivery of equipment and its parameters Attachment. No. 2.6 to SWZ.Na area Nadl. Konin:g)Fire Tower Belny:-reinforcement of the foundation, execution of reinforced concrete slab, dismantling of the observer's cabin-superstructure with the segment "2m" as the existing - reconstruction of height, assembly of the structure for the installation of photovoltaic panels., dismantling the existing and making a new fence around the viewroom, leveling the level of the investment area along with giving odp. drops – drain. rainwater to its own unpaved area, making a vertical hose and a handle for the camera and radio line, execution. power supply installation based on a power generator. with self-start (ATS) and photovoltaic installation. mounted on the constr. core of the perceptible, installation of battery batteries, assembly of inverter, assembly of telecommunications cabinet., installation of transmission link, installation of PTZ fire camera. for automatic smoke detection, installation of systems: SSWiN (intruder alarm system), CCTV, SKD installation of alarm control panels for GSM / LTE (for alarm transmission by mobile operators), configuration and commissioning of the automatic system. smoke detection, posost. Unlisted necessary works. Design doc.appendix no. 2.7doSWZ; h) Fire tower Brzeźno (Złota Góra): as in point g). Dock. design Annex 2.8 to SWZ.