The three-winged building complex of the Fichtenberg Oberschule (FOS) consists of
from an east wing, a west wing and a north wing, which are over
a spacious hall (central building) are connected to each other.
The planned construction project includes the building of the Fichtenberg Oberschule
with the exception of the auditorium, the area of mid-level staff 3rd floor and DG and the
Outer shell of the east wing.
The advertised services include the construction phase north wing:
-4 pieces of sheet steel doors and frames in the central central building and in the north wing
-Walkways to the elevator in trH C
-Upgrading stair railings in TRH C
-New stairs after elevator
-New ladder system with back protection and parapet railings in the west and east wings, 3rd floor-4. Og