General renovation of primary school Königsbrunn-Nord BA 2 with after-school care - 242-6010-01 Outdoor facilities BA2
ca. 135 m³ Pflasterflächen
approx. 420 m² asphalt + coloured asphalt
approx. 56 m fence
5 St Gates
ca. 7 to Betonabbruch
ca. 700 m² Strauchfläche Wurzelentfernung + Wurzelstockentf.
approx. 765 m³ topsoil and soil delivery
approx. 380 m³ earth wall
3 Stk HSK und SSK
approx. 70 m pipelines
approx. 741 m Edgings concrete / steel / plastic / eaves
approx. 1115 m² concrete paving + concrete slabs
12 pcs lamps
approx. 295 m cable laying
3 pcs assembly hanging rope + climbing facility
2 pcs floor games
4 pcs raised beds
2 pcs equipment and fuel housing
3 pcs trash cans
Supply and plant 68 pcs of trees + shrubs
approx. 78 m façade and slot drainage channel
110 pcs plastic palissades
ca. 24 m³ Fallschutzriesel
10 m staircase (5 pieces)
Set up 13 pcs of existing stage and benches
770 m² green roof auditorium and after-school care centre
360 m² Leerkies
approx. 1,730 m² lawns and gravel lawns