This project concerns the works required for the modification of the heat transfer station (WOS) Bullewijk in Amsterdam Southeast in order to be able to (continue to) meet the heat demand.
a. Replacing 3x410KW existing pumps including frequency inverters, cabling and connecting piping
b. Many of the existing pipe parts and the heat exchangers remain intact but are being modified and expanded, including the realization of a pressure holding and replenishment system.
c. Replacing and updating the entire electrical installation
d. The installation of a provisorium to maintain the heat supply during the modification
e. The architectural adaptation and expansion of the building
f. Replacing and updating the controller (PCS7)