Construction of a new administration building on the old slaughterhouse in Karlsruhe. The building has no basement, has 6 floors and a gross floor area of approx. 3,900 m
Services for drywall work, interior doors and maintenance work are advertised.
- Partitions plasterboard with metal stand on the raw floor approx. 1900 m
- Suspended ceilings cement boards approx. 10 m
- Steel enclosing frames with wooden door leaf 24 pieces;
- Steel reveal frames with wooden door leaf 50 pieces;
- Steel block frames with wooden door leaf 6 pieces;
- Maintenance of T30 doors 7 hours.