Refurbishment and expansion of the Anne Frank School, Wilmersdorfer Str. 19, 79110 Freiburg.
Gardening and landscaping work:
- Set up and move a site fence: 700 m,
- Break off bituminous fastening: 240 t,
- Earthworks: 1,400 m³ of topsoil removal, trenches and construction pits,
- Pressure pipeline OD160: 145 m, drainage pumping station (shaft with pumps and control),
- Production of asphalt and paving: 1 700 m
- Planting high stems: 18 pieces.
For a detailed description see II.1.4).