Construction of 50 collective dwellings, association premises, as well as a parking lot with 54 spaces.
Lot nº 01: earthworks / foundations / structural workLot nº 01: earthworks / foundations / structural work.
Lot 10: electricityLot 10: electricity.
Lot 11: elevatorsLot 11: elevators.
Lot 12: VRD / green spacesLot 12: VRD / green spaces.
Lot No 02: sealingLot No 02: sealing.
Lot n ° 03: wood frame / roofLot nº 03: wood frame / roof.
Lot 04: facade cladding / claddingLot nº 04: facade cladding / cladding.
Lot 05: metalwork locksmith / garage doorLot nº 05: metalwork locksmith / garage door.
Lot 06: exterior joinery and blackoutLot nº 06: exterior joinery and blinds.
Lot n ° 07: false ceiling lining partitions / interior joineryLot nº 07: false ceiling lining partitions / interior joinery.
Lot 08: tiled and earthenware floor coverings / flexible floor coverings / paintsLot 08: tiled and earthenware floor coverings / flexible floor coverings / paints.
Lot nº 09: VMC heating / sanitary plumbingLot nº 09: VMC heating / sanitary plumbing.