Phases 21 and 31 to 53 of SIA standard 103 for the implementation of the VALTRALOC concept developed by the town’s urban planner, through a feasibility study, a preliminary project with several variants for the implementation project, the tender and then ensuring the implementation as local construction management.
Phases 21 and 31 to 53 of SIA standard 103 for the implementation of the VALTRALOC concept developed by the town’s urban planner, through a feasibility study, a preliminary project with several variants for the implementation project, the tender and then ensuring the implementation as local construction management.