- expand approx. 13 emergency lights
- upgrade existing sub-distributor
- Total cable and line systems approx. 2,500 m
- laying systems approx. 100m cable and grid trays
- installation accessories, terminal boxes, accessories
- switching and plug-in devices
- clamping work (especially for MSR)
- drilling and chissing as required
- Provisional construction (distribution and construction lighting)
- total overheads
- documentation of audit documents
- Outdoor lighting systems in rest area and maintenance process approx. 34 pcs.
- lightning protection and grounding systems incl. potential control approx. 340m²
- Expand fire alarm system with approx. 10 detectors
- various network connections to MSR approx. 6 RJ45 ports
- disassembly, reassembly, rankings
Demolition of existing outdoor pool and children's pool facilities.
Construction of a new swimming pool on the property with the property number 154 of the Markt Oberstaufen.