The Project is for the delivery of multiple social housing units in areas of acute housing need within the Coalisland area as delineated in the maps attached at Annex A to the IM, by means of design and build. Developers must provide the land, design, and construction and ensure completion of the scheme for Apex in accordance with the DfC Housing Association Guide, Client's Requirements and statutory body requirements.
Developers should note that the maximum size of development that it is envisaged will be eligible for DfC funding is 20 units. While there may be some limited tolerance above this number, any Tender Responses proposing a development with a number of units in excess of 110% of this number is unlikely to be acceptable and may be rejected and not considered as part of the evaluation.
The Project is for the delivery of multiple social housing units in areas of acute housing need within the Coalisland area as delineated in the maps attached at Annex A to the IM, by means of design and build. Developers must provide the land, design, and construction and ensure completion of the scheme for Apex in accordance with the DfC Housing Association Guide, Client's Requirements and statutory body requirements.
Developers should note that the maximum size of development that it is envisaged will be eligible for DfC funding is 20 units. While there may be some limited tolerance above this number, any Tender Responses proposing a development with a number of units in excess of 110% of this number is unlikely to be acceptable and may be rejected and not considered as part of the evaluation.