The subject of the order is the supply of electricity between 01.01.2022r. and 31.12.2022r. to 3,099 points of consumption (PPE) with a total estimated volume (+/- 10%)
44,751.51 MWh, of this:
1) For premises and facilities — tariff groups C, G, R (Part 1 of the order) — 19 936,64 MWh — detailed list of PPE is Annex 1a to SWZ
2) For premises and facilities — tariff group B (Part 2 of the order) — 9 661,08 MWh — detailed list of PPE is Annex 1b to SWZ
3) For road lighting purposes (Part 3 of the order) — 15 153,79 MWh — the detailed list of PPE is Annex 1c to SWZ
Electricity supply to premises and facilities — tariff groups C, G, R1. Number of measurement systems accounting for the electricity consumed 1 707 pcs
2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1a to the SWZ.
3. Estimated electricity consumption over the term of the contract 19 936,64 MWh,
of this:
Zone I 12,287.48 MWh
Zone II 7,649.16 MWh
The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).
Electricity supply to premises and facilities — tariff group B1. Number of measurement systems accounting for consumed electricity 17 pcs
2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1b to the SWZ.
3. Estimated electricity consumption over the term of the contract 9,661.08 MWh, of which:
Zone I 2 148.59 MWh
Zone II 1,264.78 MWh
Zone III 6,247.71 MWh
The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).
Supply of electricity for the needs of road lighting1. Number of measurement systems accounting for electricity consumed 1 375 pcs.
2. A detailed description of the pre-emptive points (PPE) of the Contracting Party is included in Annex No 1c to the SWZ.
3. Estimated electricity consumption over the term of the contract 15 153,79 MWh,
of this:
Zone I 13,958.66 MWh
Zone II 1 195,13 MWh
The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).