Floor coating work for the expansion of forensics at BKH Schloss Werneck.
A new extension with approx. 3,011 m2 NF according to DIN 13080 with 2 wards for 24 patients each, of which 1 half-ward as
highly secured area.
Construction cycle 2 in one go:
Work and assembly planning from approx. 06.10.2023
Assembly construction site approx.08.01.2024-08.03.2024
Bautakt 2 - west wing
Preparatory work
Measuring the residual moisture of the screed 50,000 pcs
Screed sanding 1665,000 m²
Spachtelung 3 mm 300,000 m²
Filler up to 5 mm 1000,000 m²
Remove edge insulation strips 703,000 m
Kugelstrahlen 1665,000 m²
Sample areas 10,000 pcs
coatings
2K epoxy resin primer, diffusible 1665,000 m²
Sockelgrundierung, H ca. 10 cm 71,000 m²
2K epoxy resin coating, permeable, R11, D = approx. 5 mm 49,000 m²
Sockelbeschichtung, H ca. 10 cm 43,000 m
2K epoxy resin coating, dissipative, permeable, R9, D = approx. 5 mm 83,000 m²
Sockelbeschichtung, H ca. 10 cm 70,000 m
2K epoxy resin coating, dissipative, permeable, D = approx. 2 mm 1153,000 m²
Sockelbeschichtung, H ca. 10 cm 280,000 m
Polymerharz Kehlprofile 280,000 m
2K epoxy resin coating, frost and de-icing salt resistant, permeable,
R11, D = ca. 5 mm
245,000 m²
Sockelbeschichtung, H ca. 10 cm 190,000 m
Polymerharz Kehlprofile 190,000 m
2K epoxy resin coating, mechanically resistant, permeable, R10, D
= approx. 5 mm
135,000 m²
Sockelbeschichtung, H ca. 10 cm 120,000 m
Polymerharz Kehlprofile 120,000 m
Dust-binding coating on raw floor 14,000 m²
Sealing connection joint wall elast. Sealant fire protection sealing cord 703,000 m
Protective cover. Bottom area foil D = approx. 0.3mm cover. Planks D = approx. 9,-
14mm manufacture eliminate
1665,000 m²
Protective cover. 4,000 weeks
Closing holes/damage 10,000 kg
Additional costs for working on processes 50,000 pcs
Additional costs for working on pavement transitions in the door area 250,000 m
Additional costs epoxy resin coating thickness +1mm 500,000 m²