The objective of this ITT is to appoint a contractor to fabricate anchor skids to a detailed specification. This ITT will have a 2-stage process (3.4.2 Award Criteria). A minimum of 5 suppliers will process onto stage 2 where further information will be disclosed if an NDA has been signed. The NDA will be available for suppliers to complete at stage 2.
The output of the work-package will be as follows:
4 Fabricated, painted steel skids to the design specification (modular construction for shipping).
4 Fabricated, painted steel anchor connectors to the design specification.
Must demonstrate ability to conform to required fabrication standards through valid certification and previous experience.
Installed cathodic protection system as per the design specification
Demonstration of sufficient quality documentation procedures.
Logistics plan for shipping of units. Target date for all works to be completed, and for arrival to OMP (Orkney) by 15.6.2019 or earlier.