The purpose of this contract is to entrust a TCE project management mission (design and monitoring of the implementation of the adaptation of the storage and the technical premises) within the framework of the Bus2025 program, where RATP undertakes to transform the all of its bus fleet in Île-de-France (64% electric and 36% CNG), as part of this plan, RATP wants to transform the Croix-Nivert bus center to accommodate a bus park 100% electric (about 145 buses) for November 2023. In this context, hosting means allowing the load, storage (ie overnight parking of buses) and maintenance of buses.
The benefit is divided into 2 tranches, a firm tranche (TF) and a conditional tranche (TC). The TF includes the following elements of missions: APS, APD, PC-PD, PRO, synthesis of external stakeholders. The TC includes the following missions: ACT, VISA, DET, AOR, SYN.
The scope of this project includes the missions of the law MOP: APS, APD, PRO, ACT, VISA, DET, AOR and SYN and mission of synthesis between the external speakers, in particular with the MOE in charge of the electrical installation of the site . Connections to the Enedis dealer, realization of the HV distribution, supply, deployment and commissioning of the chargers will be supported by another MOE. The following services will be covered by the contractor performing civil engineering work and building adaptations made necessary by the aforementioned equipment, installation of equipment and infrastructure related to the protection of the environment (ICPE), detection fire, sprinkling, smoke extraction. Adaptation of industrial equipment for the maintenance of electric buses. Optimization of the workshop to increase storage capacity integration of ecodesign principles (LED, insulation, A + materials, ventilation ...).