Renovation of Merkel'sches Schwimmbad Esslingen:
The GFA is approx. 3,000 m² and the BRI 12,000 m³.
The following measures are to be carried out as part of the upcoming renovation:
- Complete renovation of the sports pool and the indoor swimming pool
- Renewal of the technical equipment
- fire protection upgrading
- Barrier-free access
The work will be carried out from September 2023 to December 2024.
Badetechnik:
- dismantling
- 6 filters, 3 functional containers, otherwise. Inst.
-Reinstalling
- 8 filters d 1000 to 2000, 7 functional containers made of PP
- 18 circulating pumps, compressed air system
- Chlorine gas system, measuring and dosing technology
- 3 lifting systems
- Plastic piping and fittings for
- 5 Badewasserkreisläufe
- MSR Badewassertechnik