As part of its competence in the disposal and recovery of household waste, the Provence Verdon Community of Municipalities (CCPV) operates 5 waste collection centres on its territory. In order to comply with the regulations in force and to optimize the operating costs of these facilities, the CCPV wishes to create a new waste disposal center in Tavernes
Big work- Earthworks,- Carrying out civil engineering, walls and paving,- Laying all dry and wet networks,- Constructing a heavy road,- Supply and installation of equipment,- Options: access road and crossing platform
Buildings & Metalwork- The construction of a 45m² guarding room, made of recycled shipping container fitted out with insulation, painting, connection, interior supplies?,- the installation of a 170m² metal framework (awning with cover, gutter, steel tray), to shelter the waste collectors, with a mesh part with a wide gate, to secure the WEEE, - a reuse space composed of 2 insulated shipping containers, and a metal-framed courtyard corresponding to the material library. It will include photovoltaic panels (supply and installation of 45m² for resale).- The installation of rigid and flexible fences
Green spaces- Preparation of plantings: pits, soil movement, soil amendment, - installation of watering and stakes, - planting