Replacement construction of the Rezat Bridge:
Earthworks / excavation pits: 45.000m³
Reinforced concrete: 15,160 m³
Reinforcing steel: 3,260 t
Überbauabdichtung: 9.630 m²
Built-up: 6,750 m²
Asphaltschichten: 32.000 m²
The existing structure (2 substructures) is to be completely demolished.
Replacement bridge BW 753a over the Rezat, a