In the course of the wastewater transfer Wilsdruff - Kaditz, the conversion of the wastewater treatment plant Klipphausen will take place in parallel. For this purpose, in section 1.3.1. First, the pool 1 and the associated EMSR technology decommissioned and rebuilt.
In section 1.3.2, the reconstruction of basins 2 to 5 takes place.
The services include in detail
- manufacture buoyancy safety basin 2 [52 Dywidag permanent anchors á 3.26 m (169.52 m total length); Downslope / profiled concrete; mechanical equipment],
- Manufacture buoyancy safety tank 3 [4 pieces Dywidag permanent anchor á 4.88 m (19.52 m total length); 52 Dywidag permanent anchors á 3.68 m (191.36 m total length); Downslope / profiled concrete; Equipment],
- manufacture buoyancy safety basin 4 [4 pieces Dywidag permanent anchor á 5.65 m (22.60 m total length); 52 pieces Dywidag permanent anchors á 4.46 m (231.92 m total length); Downslope / profiled concrete; Equipment],
- Manufacture buoyancy safety basin 5 [52 pieces Dywidag permanent anchor á 5.50 m (286.00 m total length); Downslope / profiled concrete; Equipment],
- Construction SPW (return pumping station) [prefabricated construction DN1500; mechanical equipment],
- Pipe construction [60m SW-DL PE 100 125 x 7,4 SDR 17; 130 m DN / OD 315 PP; 10 m DN / OD 400 PP; 60 m DN / OD 500 PP],
- Earthworks [amount for above mentioned services approx. 700 m
- Dismantling and damming work.